How Long Does it Take to Install a Plumbing System?

When you’re planning a construction project, whether it’s building a new home or remodeling an existing one, one of the most crucial parts of the process is plumbing system installation. It’s easy to overlook, but plumbing is essential for everything from clean water to sanitation. One common question that often comes up during construction is “How long will it take to install the entire plumbing system”?

While there’s no one-size-fits-all answer, several factors can influence the time it takes to install a plumbing system. T&T Plumbing & Heating, Inc. explains the various elements that affect plumbing installation timelines to give you a better idea of what to expect.

Factors That Affect Plumbing Installation Time

Installing a plumbing system isn’t just a matter of laying pipes. It involves a series of steps that require precision, expertise, and the coordination of different components. The time it takes to complete plumbing installation depends on several factors:

Size of the Building

Larger buildings or homes with multiple bathrooms and kitchens naturally require more extensive plumbing systems, which can take longer to install. For example, installing plumbing and a drainage system in a small two-bedroom home might take less time than a three-story house with multiple bathrooms and a complex plumbing layout. Due to their size and scope, commercial plumbing systems can take much longer to install.

Type of Project: New Construction vs. Remodeling

The installation timeline for a plumbing system in new construction is typically more predictable than in a remodeling project. When building from the ground up, water supply lines, drain pipes, and gas lines can be installed without having to work around existing structures. In a remodel, plumbers may need to deal with older pipes, outdated systems, or other challenges, which can add time to the project.

Complexity of the Plumbing System

Not all plumbing systems are created equal. Some homes may have basic setups with standard water heaters and pipes, while others might include more advanced features like radiant floor heating, tankless water heaters, or complex irrigation systems. The more complex the system, the longer it will take to install.

Plumbing Fixtures

The number of plumbing fixtures such as sinks, toilets, showers, and appliances also impacts the timeline. Installing just a few basic fixtures will take less time than installing high-end or custom fixtures, which might require special handling or additional connections.

Local Plumbing Codes and Inspections

Plumbing installations are subject to local building codes and regulations. After certain stages of the installation, inspections are often required before work can proceed. The availability of inspectors and the speed at which inspections are completed can either shorten or lengthen the timeline.

General Plumbing Installation Timeline

Though the exact time frame can vary depending on the factors mentioned above, let’s break down a general timeline for a completely new plumbing system installation in a typical residential new construction plumbing project.

Rough-In Plumbing

The first stage of plumbing installation, known as the rough-in, involves laying out the plumbing supply lines, drain pipes, and connections that will supply water and remove waste. This part of the process usually takes place after the framing of the home is complete but before drywall is installed.

During the rough-in, plumbers will install supply lines for water, drain pipes for waste removal, and vent pipes to ensure proper drainage, and connect the home to the municipal water supply and sewer or well and septic system.

The rough-in plumbing process can take around 3 to 5 days depending on the size of the home and the complexity of the system. If the house has multiple stories or complex layouts, it may take longer.

Final Plumbing Installation

After the rough-in is complete and the walls have been finished, the next step is the final installation. This is when plumbers come back to install fixtures like sinks, faucets, toilets, and showers. They will also hook up appliances like water heaters, dishwashers, and washing machines at this stage.

Depending on the number of fixtures and appliances, this part of the process can take another few days. Custom fixtures or specialty installations, such as rain showers or high-tech appliances, may require more time and expertise.

Inspections

Throughout the plumbing installation process, inspections are required to ensure everything is up to code, which can prevent costly repairs later on. Inspections typically happen after the rough-in to inspect visible pipes, and once the final installation is complete. The time it takes for inspections depends on your local building authority and the availability of inspectors. Sometimes, this can cause delays if inspectors are not readily available.

How Long Does It Take to Install Plumbing Fixtures and Appliances?

When you’re not dealing with a full home construction or remodel but simply replacing plumbing fixtures or appliances, the timeline can be much quicker. The time it takes to install or replace different fixtures depends on the complexity of the appliance, the existing plumbing system setup, and the accessibility of the location. Here’s a breakdown of how long you can expect common plumbing fixture and appliance replacements to take:

Toilets (1-2 Hours)

Replacing a toilet is a relatively quick job for a professional plumber, usually taking around 1 to 2 hours. If the new toilet is a straightforward replacement of the existing one, the process is as simple as turning off the water, removing the old toilet, installing the new one, and ensuring it’s properly sealed to eliminate sewer gases. However, if the flooring or flange underneath needs repair or if the toilet is located in a difficult-to-reach spot, it could take longer.

Sinks (2-4 Hours)

Installing or replacing a sink can take between 2 to 4 hours, depending on the type of sink and the condition of the existing plumbing. For example, a drop-in kitchen sink can usually be replaced more quickly than an undermount sink, which might require more precise alignment and sealing. The presence of garbage disposals or complex faucets with multiple connections can also add to the installation time.

Faucets (1-2 Hours)

Replacing a faucet is one of the quicker jobs, typically taking 1 to 2 hours. This time frame applies to both kitchen and bathroom faucets. The process involves turning off the water, removing the old faucet, and securing the new one in place. If you’re upgrading to a faucet with additional features (like a pull-down sprayer or touchless sensor), the installation might take a bit longer, especially if it requires electrical wiring.

Water Heaters (3-5 Hours)

Installing a new hot water heater, whether a traditional tank model or a tankless unit, can take anywhere from 3 to 5 hours. A straightforward tank water heater replacement involves draining the old tank, removing it, and connecting the new unit to existing plumbing and gas or electrical lines. However, installing a tankless water heater may take a bit longer, especially if new gas lines or vent pipes are required.

Showers and Bathtubs (4-8 Hours)

Replacing a shower or bathtub is a more involved process that can take anywhere from 4 to 8 hours, depending on the complexity of the job. If you’re swapping out a basic bathtub or shower for a similar model, the timeline is on the shorter side. However, upgrading to a luxury shower system, converting a tub to a shower, or dealing with any tiling work can extend the time considerably.

Garbage Disposal (1-3 Hours)

A garbage disposal installation or replacement usually takes 1 to 3 hours. The process involves disconnecting the existing disposal (if there is one), mounting the new unit, and connecting it to the plumbing and electrical systems. If you’re adding a disposal to a sink that didn’t have one previously, the installation might take longer due to the need for additional wiring, drain pipe materials, and plumbing system adjustments.

How to Speed Up Plumbing Installation

If you’re working with a tight deadline, there are ways to help ensure your plumbing installation goes as smoothly and quickly as possible:

  • Plan Ahead: Make decisions about your plumbing system early in the process to avoid delays. Work closely with your plumbing contractor to select fixtures and appliances in advance, and make sure they are available when needed.
  • Choose an Experienced Contractor: Hiring a reputable and experienced plumbing company can help keep your project on track. Skilled plumbers are more likely to complete the job efficiently and handle any challenges that arise during the installation.
  • Prepare for Inspections: Schedule inspections well in advance, and make sure your contractor is aware of the inspection dates to avoid unnecessary delays.

Plumbing Installation From T&T Plumbing & Heating, Inc.

At T&T Plumbing & Heating, Inc., we bring years of experience to every plumbing installation project, from complex new construction to straightforward fixture and appliance replacements. Our skilled team understands the importance of precision and efficiency in every job, ensuring your plumbing system is installed to meet the highest standards. 

Whether you’re building a new home or simply upgrading your kitchen or bathroom, we have the expertise to handle every aspect of the job, big or small. Contact us today to learn more about our plumbing installation services and how we can assist with your next project!